Skip to content
Commercial Interior Contractors
← All work

Job profile · Education

Miami Dade College — Homestead Campus, Building D

Miami Dade College · 2024

Blue carpet blocks running up the grand stairwell of Building D at MDC Homestead
Client
Miami Dade College
Location
Homestead Campus, 500 College Terrace, Homestead
Year
2024
Scope
Library, main corridors, grand stairwell, offices and public safety
Sector
Education

Overview

New floors through the heart of Building D at Miami Dade College’s Homestead Campus: the library, the main corridors on all three floors and the grand stairwell that ties them together, followed by a second phase in the offices and the public safety area.

The design

The pattern is built from long 12-by-36-inch carpet planks in four colors. Deep blue and bright blue blocks are scattered across a grey field, so the corridors read like a current running from one end of the building to the other. The same blocks climb the grand stairwell, past a row of international flags, and spread out across the library between the stacks and study tables.

The work

The stairwell was the detail work. Every tread was wrapped in carpet and finished with aluminum stair nosing, with the blue blocks set so the pattern keeps flowing from landing to landing.

The building stayed in use for the college, so the job moved in phases: corridors and stairs first, then the library, then the offices and public safety spaces, where CIC installed wood-look luxury vinyl plank and new vinyl base.

Products installed

  • Mohawk Color Balance carpet tile, 12″ x 36″, in Aquarius, Flame, Bedrock and Nightshade
  • Schluter Vinpro-Step aluminum stair nosing
  • Mohawk Large and Local luxury vinyl plank
  • Johnsonite 4″ vinyl base
The grand stairwell, lined with international flags, carpeted tread by tread
Blue blocks sweeping through the library beside the curved book stacks
Long blue planks scattered across the grey corridor field
Study tables in the library, set on the new carpet
The main corridor running past classroom windows
The office corridor in the second phase

Need something like this? We design and build it, install it to your spec, or join your team as the finishes trade partner.

Start a project
Next jobGwen Cherry Park — Gymnasium