Overview
The second floor of Building 3 at Miami Dade College’s Wolfson Campus in downtown Miami: new flooring through the classrooms and corridors and new ceiling grid overhead, completed in early 2026.
Commercial Interior Contractors
Job profile · Education
Miami Dade College · 2026
Overview
The second floor of Building 3 at Miami Dade College’s Wolfson Campus in downtown Miami: new flooring through the classrooms and corridors and new ceiling grid overhead, completed in early 2026.
The design
A pale stone-toned plank carries the floor, and planks in two blues, a light Big Wave and a deep Midnight Twinkle, are set in staggered runs that drift across each classroom, so the floor feels like moving water.
The work
The old ceiling grid and flooring came out, new grid went in overhead, and the plank was laid to a shop-drawn pattern so every blue run landed where the design put it. Charcoal rubber base finished the walls.
Products installed
Need something like this? We design and build it, install it to your spec, or join your team as the finishes trade partner.
Start a project