Overview
Ten jet bridges at gates A1, B2, B5–B8, C3, E1, E10 and F2, replaced bridge by bridge, airside, between departures.
Commercial Interior Contractors
Job profile · Government · Aviation
Fort Lauderdale-Hollywood International Airport · 2023
Overview
Ten jet bridges at gates A1, B2, B5–B8, C3, E1, E10 and F2, replaced bridge by bridge, airside, between departures.
Scope
Carpet tile replacement in ten passenger boarding bridges.
Products installed
Need something like this? We design and build it, install it to your spec, or join your team as the finishes trade partner.
Start a conversation